How to reach us
|
TECHNICAL DATA
- Open all year 24H with toll
- Alternating one-way
- Lenght: 3,5 km
- Height: 3,6 m
- Width: 2,5 m
|
CONDITIONS
- Payment only in EURO and SWISS FRANCS
- Credit cards accepted
- A valid document required to travel abroad
- (identity card or passport)
- Snow chains required from 15 October to 30 April
|
CLOSING OF TUNNEL FOR MAINTAINANCE WORKS from 14 to 19 Mai 2012 and from 21 to 26 Mai 2012 from 20 to 6
From 27 of Mai tunnel will be open 24H a day.
-
Engadiner Kraftwerke AG
Postfach
Zernez (CH)
Tel: 0041 (0)81 851 4311
Fax: 0041 (0)81 851 4303
www.engadin-strom.ch/
-
Guardia di Finanza
Località Ponte del Gallo
Livigno
Tel: 0039 0342 997 271
-
Customs La Drossa (CH)
La Drossa
Tel: 0041 (0)81 856 18 88
Order by