NEW LIFT VALLACCIA IN LIVIGNO BECOMES REALIY

31/08/2015

(String: {%- set hs_blog_post_body -%} {%- set in_blog_post_body = true -%} <span id="hs_cos_wrapper_post_body" class="hs_cos_wrapper hs_cos_wrapper_meta_field hs_cos_wrapper_type_rich_text" style="" data-hs-cos-general-type="meta_field" data-hs-cos-type="rich_text" >Mottolino Fun Mountain extends the ski area with the construction of the new lift “Vallaccia”: a last generation 6 places chairlift will serve the homonym area, extending by 30% its slopes area and increasing the attractiveness of the prestigious Italian destination.<br><!--more--> <p><span>The chairlift will place its bottom station at 2079m asl to reach 2717m asl, for a total length of 1848 m and a vertical rise of 638m.&nbsp;With a capacity of 2800 people per hour, it will be&nbsp;</span><strong>the longest chairlift within the Little Tibet</strong><span>, and the highest within the Mottolino ski area. Men are already at work and the lift should be ready during the upcoming winter season.</span></p> <div><span><br role="presentation" data-uw-rm-sr=""></span> <div><strong>Marco Rocca</strong>, Mottolino CEO, declares:</div> <div><span><br role="presentation" data-uw-rm-sr=""></span> <p><em>“The new chairlift Vallaccia is a crucial goal for Mottolino and we want to specify to our guests, all of them passionate about the mountain and its biodiversity, that the chairlift will limit its environmental impact to the presence of the load bearing structure and the two stations, and it will be accessible exclusively from the slopes. To facilitate the flow of tourist we are enlarging Trepalle parking area, to create proper conditions for an easy access to the ski area without engraving the new “Vallaccia” area”</em><em>.</em></p> </div> </div></span> {%- endset -%} {%- set hs_blog_post_summary -%} Mottolino Fun Mountain extends the ski area with the construction of the new lift “Vallaccia”: a last generation 6 places chairlift will serve the homonym area, extending by 30% its slopes area and increasing the attractiveness of the prestigious Italian destination.<br> {%- endset -%} {%- blog_post_data_wall_wrapper body={{hs_blog_post_body}}, summary={{hs_blog_post_summary}} %})
Mottolino Fun Mountain extends the ski area with the construction of the new lift “Vallaccia”: a last generation 6 places chairlift will serve the homonym area, extending by 30% its slopes area and increasing the attractiveness of the prestigious Italian destination.

The chairlift will place its bottom station at 2079m asl to reach 2717m asl, for a total length of 1848 m and a vertical rise of 638m. With a capacity of 2800 people per hour, it will be the longest chairlift within the Little Tibet, and the highest within the Mottolino ski area. Men are already at work and the lift should be ready during the upcoming winter season.


Marco Rocca, Mottolino CEO, declares:

“The new chairlift Vallaccia is a crucial goal for Mottolino and we want to specify to our guests, all of them passionate about the mountain and its biodiversity, that the chairlift will limit its environmental impact to the presence of the load bearing structure and the two stations, and it will be accessible exclusively from the slopes. To facilitate the flow of tourist we are enlarging Trepalle parking area, to create proper conditions for an easy access to the ski area without engraving the new “Vallaccia” area”.

Stay updated on offers and holiday ideas!

Subscribe to our newsletter

I agree to receive the APT Livigno newsletter. You can unsubscribe from these communications at any time. Read our privacy policy statement.

* Required field
BLOG_POST

Sleeping in Livigno

Scopri i nostri Hotel e gli Appartamenti, dentro ci trovi tutto per una vacanza indimenticabile.

calendar-icon
Check-in
calendar-icon
Check-out
icon
Accommodation
See all
star star star

Hotel Capriolo

Via Borch, 96
star star star star

Hotel St. Michael

via dala Gésa, 678
star star star star

Sport Hotel

Via Palipert 78
star star star

Hotel Alpenrose

Via Plan, 140
star star star star

Hotel La Suisse

Via Olta, 245
star star star

Garni Rin Da Rin

via Saròch, 68c
star star star

Appartamento Arcadia

Via Rasia, 511
star star star

Baita Soldanella

via Florin 307
star star star

Residence Nevegall

Via Olta 258
star star star star

Bio Chalet Teola Wellness & Spa

Strada Statale 301, n. 693
star star star

Alpenlodge Michela House

via Rin, 337
star star star

Baita La Bröina

Via Florin, 24