NEW LIFT VALLACCIA IN LIVIGNO BECOMES REALIY

31/08/2015

(String: <span id="hs_cos_wrapper_post_body" class="hs_cos_wrapper hs_cos_wrapper_meta_field hs_cos_wrapper_type_rich_text" style="" data-hs-cos-general-type="meta_field" data-hs-cos-type="rich_text" >Mottolino Fun Mountain extends the ski area with the construction of the new lift “Vallaccia”: a last generation 6 places chairlift will serve the homonym area, extending by 30% its slopes area and increasing the attractiveness of the prestigious Italian destination.<br><!--more--> <p><span>The chairlift will place its bottom station at 2079m asl to reach 2717m asl, for a total length of 1848 m and a vertical rise of 638m.&nbsp;With a capacity of 2800 people per hour, it will be&nbsp;</span><strong>the longest chairlift within the Little Tibet</strong><span>, and the highest within the Mottolino ski area. Men are already at work and the lift should be ready during the upcoming winter season.</span></p> <div><span><br role="presentation" data-uw-rm-sr=""></span> <div><strong>Marco Rocca</strong>, Mottolino CEO, declares:</div> <div><span><br role="presentation" data-uw-rm-sr=""></span> <p><em>“The new chairlift Vallaccia is a crucial goal for Mottolino and we want to specify to our guests, all of them passionate about the mountain and its biodiversity, that the chairlift will limit its environmental impact to the presence of the load bearing structure and the two stations, and it will be accessible exclusively from the slopes. To facilitate the flow of tourist we are enlarging Trepalle parking area, to create proper conditions for an easy access to the ski area without engraving the new “Vallaccia” area”</em><em>.</em></p> </div> </div></span>)
Mottolino Fun Mountain extends the ski area with the construction of the new lift “Vallaccia”: a last generation 6 places chairlift will serve the homonym area, extending by 30% its slopes area and increasing the attractiveness of the prestigious Italian destination.

The chairlift will place its bottom station at 2079m asl to reach 2717m asl, for a total length of 1848 m and a vertical rise of 638m. With a capacity of 2800 people per hour, it will be the longest chairlift within the Little Tibet, and the highest within the Mottolino ski area. Men are already at work and the lift should be ready during the upcoming winter season.


Marco Rocca, Mottolino CEO, declares:

“The new chairlift Vallaccia is a crucial goal for Mottolino and we want to specify to our guests, all of them passionate about the mountain and its biodiversity, that the chairlift will limit its environmental impact to the presence of the load bearing structure and the two stations, and it will be accessible exclusively from the slopes. To facilitate the flow of tourist we are enlarging Trepalle parking area, to create proper conditions for an easy access to the ski area without engraving the new “Vallaccia” area”.

Stay updated on offers and holiday ideas!

Subscribe to our newsletter

I agree to receive the APT Livigno newsletter. You can unsubscribe from these communications at any time. Read our privacy policy statement.

* Required field
BLOG_POST

Sleeping in Livigno

Scopri i nostri Hotel e gli Appartamenti, dentro ci trovi tutto per una vacanza indimenticabile.

calendar-icon
Check-in
calendar-icon
Check-out
icon
Accommodation

See all

Hotel Alegra

Via Saroch, 1274B

Hotel Amerikan

Via Florin, 77

Hotel Green Rose

Via Saroch, 1520

Hotel Vetta Livigno - Alpine Relax

Via Saroch 51

B&B The King Livigno

Via Piceir n. 67

Carpe Diem

Via Plan 347/H

Suite Mariana Livigno

via Borch 804

Cuore Alpino Ecochalet

Via Saroch, 288

Appartamenti Campacc

Via Campacc, 207/209

Appartamento Stefan

Via Stefan, 576

Casa Natale

Via Saroch, 716

Chalet Garden

Via S.S. 301, 708

Chalet Hygge

Via S.S.301, 19

AK Chalet - Akon

Via Olta, 216

Chalet La Masonecia

Via Pont Lonch 320

AK Chalet - Akaroa

Via Olta 216

Nova Lodge

Via S. S. 301, n. 127